That’s a lot of money to have those kind of problems. It’s an aircraft carrier that will struggle to land and launch planes, move munitions up to the deck, and defend it’self. Oh, and the dual band radar doesn’t work.
The most expensive warship ever built has been delayed from hitting the front line because it is reportedly not ready for battle.
The $12.9 billion USS Gerald R. Ford Navy supercarrier - the first of three in its class with a total cost of $43 billion - could potentially struggle with planes landing and taking off, moving military weapons and being able to successfully defend itself, a memo obtained by Bloomberg News reads.
The memo allegedly states ‘poor or unknown reliability issues’ were identified in a letter dated June 28.
‘The Navy’s announcement of another two-month delay in the delivery of CVN-78 further demonstrates that key systems still have not demonstrated expected performance,’ McCain said in a statement.
'The advanced arresting gear (AAG) cannot recover airplanes. Advanced weapons elevators cannot lift munitions. The dual-band radar cannot integrate two radar bands. Even if everything goes according to the Navy’s plan, CVN-78 will be delivered with multiple systems unproven.
‘This situation is unacceptable and was entirely preventable. After more than $2.3 billion in cost overruns have increased its cost to nearly $13 billion, the taxpayers deserve to know when CVN-78 will actually be delivered, how much developmental risk remains in the program, if cost overruns will continue, and who is being held accountable.’
I’m pretty sure when you ask any Branch of the Military “What do you want this to do?” your answer usually comes to you with the engineering equivalent of packing forty pounds of crap in a five pound crap sack.
So now when it is completed and it has a few issues don’t be surprised. Those issues will get fixed, it may take some time but it will get done.
What should concern you is when it is completed and it is finally working, what is the plan for repairing this stuff out at sea?
Seems that in the US, you use billions of dollars to build something. Once built you learn what doesn’t work, then you spend a few more billion dollars fixing it until it works like it was supposed to in the first place. It’s the “trial and error” manufacturing method that we know so well lately.
At least Carter was a Navy man. I guess when they make the Barack Hussein Obama (CVN-0) it will only have drones.
As to the new U.S.S. Ford, it’s new, it is literally full of new, never before used, tech so of course it’s going to have problems. There’s nothing normal about landing an aircraft on what amounts to a football field that is pitching and rolling. Although the USN has been doing it with jet aircraft for over 60 years so if it ain’t broke…
I really hope that whoever is in charge of naming ships spares us anything named Obama. That would be pathetic. How’d you like to be a plank owner for that one? Shit.
Just my experience dealing with the Military lately;
Did you check the oil?, “No it’s under Warranty.”
Did you bring extra oil if you used some oil bringing it out here? “No, really it’s under Warranty?”
Did you notice the Oil Pressure Light , gauge or audible warning? “No, because we knew it was under Warranty.”
Did the smell or the smoke lead you to believe there may be an issue? “No, really Sir, it’s under Warranty.”
When the flames from the engine compartment came out of the exhaust ducts…
And from the Maintenance Tech; “You guys are going to replace that engine right, isn’t it still under Warranty?”
From the XO, “Can I see the contract on this Vehicle?”
From the LTC; “You guys Suck, there goes my OR Rate”
From the Colonel, “What do you mean they aren’t checking the oil before the move out ?”
The Military doesn’t do Maintenance anymore, for the most part you might find five mechanics trying to keep a Cavalry Troop up and running.
So I read the article. I’m aware that news media stories on new military equipment tend to have megadoses of Chicken Little. Does anyone know from a better source (including firsthand) what the real problems are and how easy and quick the fixes are likely to be?
Several of my clients work for Huntington Ingalls in Newport News, so I asked… They aren’t giving away the farm with info, but it has been said this is very overblown. New systems are usually tested, tweaked, and tested again, all multiple cycles before a ship can be delivered. The GRF isn’t even supposed to be in service until 2019. The thing is a massive presence on the James River, and people probably think “floating boat, it must be ready to go.” I’ve been down to see the ship and it really is an impressive beast just east of the bridge.
It’s not an issue of “return it under warranty,” it’s an issue of “the thing hasn’t been delivered yet.”