KAC URX install....

50 ft/lbs +/- 5 ft/lbs.

The barrel nut wrench, p/n 20495 has dropped in price. You can find it online for about $100 now.

Make sure you throughly heat the assembly. The aluminium barrel nut will give against the steel tool unless the loctite is heated enough.

yeah. I saw that. I will be purchasing one when one becomes available.

Also, what do you mean the barrel nut will give against the steel tool. Do you mean when removing the barrel nut?

I am building an upper from parts, so removing the barrel nut will not be necessary until a future date.

What is your source for this spec?

The Knight’s instruction sheet I have seen reads -

“Torque barrel nut initially to 50 Ft. Lbs. and then loosen slightly twice. Then final torque to 75 Ft. Lbs. With Type 2 URX wrench (P/N: 20495).”

Email Robb Jenson. He removes the Urx rail for a very convenient price. Just did mine with a two week turn around and came out great.

Its printed on the barrel nut wrench. One of the KAC reps wrote in a thread here or on TOS, the 75 ft/lbs was the spec for the old steel barrel nuts.

From Kevin B on TOS, thread dated 4-2011

Steel (Type I) Barrel nut was 75ft/

Aluminum (TypeII) Barrel nut is 50-55.

coldblue did a revised instruction sheet after the one you posted was done…

http://www.ar15.com/archive/topic.html?b=2&f=381&t=203140

Also, what do you mean the barrel nut will give against the steel tool. Do you mean when removing the barrel nut?

The relatively soft barrel nut will round out against the hard tool steel of the wrench if the loctite isn’t heated enough. The holding power of the Loctite is greater than the strength of the aluminium barrel nut, to state it simply.

I don’t doubt you know what’s up but that seems strange. I’ll make some calls later since I want a URXIII slapped on my AR…

I mean, it’s just tool use and the application being done right?

The cost of the tool is high, but has gotten MUCH better as of late. They aren’t hard to install per se, provided the rail will twist into alignment with the upper so the rail(s) are perfectly aligned. If not, the rail has to be timed.

Marvin Pitts is doing work with KAC rail systems, he would be my go-to for anything KAC/URX related if you don’t want to do it yourself.